GB-015: the checkout could not fast-forward after the pin landed¶
Generated from ops/errors/catalog.yaml by ops/ci/check-error-catalog.py --write; do not edit here. GB-015 is printed by goatbuilder. The same text offline: goat explain GB-015 or goatbuilder explain GB-015.
What it means¶
the pin PR merged, and the local main has diverged from origin/main, so the deploy could not proceed from a current tree. The PR is in; re-running resumes.
Why it happens¶
- local commits on main
What to do¶
One line per step or alternative:
git -C <repo> status; move local commits to a branch; git pull --ff-only origin main; re-run the same command
Read more¶
Exit code¶
goatbuilder exits with 1.